TDS Application Notes
1. Using a hammer, drive an awl or screwdriver through the top and bottom of the upper container and allow the contents to run into the lower container (min. 1 minute). Remove the upper container and stir the lower container thoroughly. 2. Apply and distribute a thin coat of the mixed oil to the floor. On large floors work in sections and overlap wet-on-wet. 3. Allow the wood to absorb the oil for 15-30 minutes and then buff the surface with a buffing machine equipped with a red or beige pad. 4. Make another pass with more oil if required to ensure that absorbent areas are saturated. 5. Allow another 15-30 minutes of oil exposure before removing surplus oil with cotton cloths fitted under a buffing machine. 6. Buff the surface with a Bona Wool Pad for a flawless finish. 7. Let surface dry at least 8 hours² (coloured oil min. 12 hours²) before resuming foot traffic. Ensure good ventilation during application and drying. ²drying time at 20°C/60% RH, expect longer drying time on tropical wood species, at high relative humidity and at low temperatures. The room can normally be furnished after 12-24 hours but wait approx. 1 week before covering the surface with rugs. Allow 1-2 days drying before cleaning with wet methods.