TDS Application Notes
1) Apply using a Bona Roller or T-bar applicator at 8-10m²/litre (100-120g/m²) ensuring an even distribution of product. Always maintain a “wet edge” between sections to avoid overlaps. 2) Allow to dry properly before applying further layers. Ensure proper ventilation. 3) If necessary, make an intermediate sanding using the Bona Scrad System P150 grit (or finer) and remove dust before applying a final layer of lacquer. Note: If the previous layer of lacquer/primer has been allowed more than 24 hours drying time then an intermediate sanding is always required. The curing process takes approximately 5 days, (70% cured in 24 hours, 90% after 72 hours). Do not cover the surface with sport matting, cushions and similar until the floor has fully cured. The floor may be walked on after 24 hours but remains susceptible to scuffing or marring until completely cured. During the first week, do not wet clean, only dry clean to remove dust, etc


