Bona’s unique Dust Care System (DCS) helped a flooring contractor secure a valuable contract in a highly dust-sensitive environment. The contract involved the sanding and re-sealing of the stage in Manchester’s prestigious Bridgewater Hall, the city’s acclaimed international concert hall.

In its pre-launch tests, the DCS removed 99.996% of dust from the working environment and by connecting an edge sander and belt sander to the DCS unit at the same time, they were able to work very quickly.

The Contracts Director, Andy Acton said, “As we worked, the DCS unit drew all the dust away from the machines, the abrasives and the floor and the hall’s Facilities Manager, George Sidgwick said, “The DCS was brilliant! I expected some dust to be generated but the system outperformed my expectations.”

Type of floor: American Red Oak
Surface area: 1,350 m2
Application method: Bona Roller
New or Renovated: New
Year: 2007

Location: United Kingdom

Products used:

  • Bona Prime Classic
  • Bona Mega