We use cookies to give you a better experience of Bona's web.Read about cookies on bona.com

United Kingdom/Ireland

A tough surface for a busy rooftop bar

Bona products were used for the installation and finishing of a 20mm engineered, dark fumed oak parquet floor at London's new urban hotel, Assembly London.

Bona D501 primer was applied to the WBP plywood subfloor, and then the parquet blocks were stuck down using Bona R848 silane adhesive. The pre-wirebrushed blocks were then finished with Bona Craft Oil 2K (Frost) and buffed back again to achieve a white limed effect in the grain. Two coats of Bona Traffic HD (silk matt) lacquer - Bona's most durable polyurethane finish - was then applied to provide the hard wearing surface required in the busy bar area. The fast curing time of both Bona Craft Oil 2K and Bona Traffic HD enabled the Timbered team to work within a tight timetable.

Assembly London